American Structurepoint Plan Room

HeaderHeader

Herrick Drive Rebuild OSU

Order

Herrick Drive Rebuild OSU

Contact

Company Contact

American Structurepoint Inc.
Jessica Chio
Location

Location

Columbus, OH

Pre-Bid Information

Pre-Bid Information

02/03/2026 10:00 AM ET
All Bidders are strongly encouraged to attend the Pre-Bid Meeting on February 3, 2026, at 10 a.m., using the following link via TEAMS: JOIN TEAMS MEETING Meeting ID: 282 451 069 516 74 Passcode: qh7qp6hB

Join Meeting
Passcode: qh7qp6hB
Bid Information

Bid Information

02/13/2026 02:00 PM ET
Bidders are encouraged to be enrolled in and to be in good standing in a Substance Use Prevention and Recovery (SUPR) Program approved by the Ohio Bureau of Workers' Compensation (“OBWC”) prior to submitting a Bid and provide, on the Electronic Bid Form with its Bid, certain information relative to their enrollment in such a program; and, if awarded a Contract, shall comply with other SUPR criteria described in Section 1.6 of the General Conditions. Electronic bids will be received for: Trade Estimate General Contract ....................................................... $3,155,300 Alternate G-1Woody Hayes Signal Upgrades ............. $51,100 Alternate G-2 Traffic Cameras .................................... $55,000 until February 13, 2026, at 2 p.m., when all Bids will be electronically opened. Bid tabulations will be posted no later than 5:00 p.m. on the day Bids are opened.

Bid Categories

BIDDER
Subcontractor/Supplier
Plan Room
(C) Eastern Engineering Use Only

Job Purchase Information:

Bidding documents may be ordered per the options and pricing listed on the Order page (plus Processing/ECO fee, Shipping when applicable, and Tax). Credit Card or Eastern Engineering Charge Account required before printing purchases.

PLEASE NOTE - IF YOU ORDER ONLY THE FREE DOWNLOAD, IGNORE THE CHARGES THAT APPEAR AND BE SURE TO SELECT ''NO DEPOSIT/NO CHARGE'' AS YOUR PAYMENT OPTION.

If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering and are posted on the Spec Sheets tab.

*****ADDENDA ARE NOT INCLUDED IN PURCHASE SET PRICES UNLESS SPECIFICALLY STATED. ADDENDA ARE POSTED FOR DOWNLOADING ON THE INFORMATION AND ADDENDA TABS.*****